Lollar Electric

For builders

Electrical for new home construction

Lollar Electric wires new houses for builders and general contractors in the Prescott area. We do the rough-in before insulation and drywall and come back for trim when the finishes are in. Our work runs from standard single-family homes to custom homes of more than 15,000 square feet.

Open roof trusses in a new house with recessed light housings and cable roughed in, and a wide valley view through the gable opening
Rough-in on a new home near Prescott: recessed light housings and cable in the trusses, before insulation and drywall.

From framing to final

  1. Layout

    We work from the plans and settle the layout with the builder before wire is pulled: box locations, switch heights, where the panel goes and how the service reaches it.

  2. Rough-in

    With the house framed, we set the boxes and pull cable to every outlet, switch and fixture location. All of it goes in, and is inspected, before insulation and drywall cover it.

  3. Trim

    Once the finishes are in, we come back and set the devices: outlets, switches and light fixtures. On a custom home the lighting is often the largest part of this stage.

  4. Final

    The circuits are energized and tested so the house is ready for its final inspection.

What changes the electrical scope of a house

  • Size and layout. More square footage means more circuits and longer runs. A large custom home usually has subpanels so that no run is longer than it should be.
  • The size of the service. A house with electric heat, several air conditioners, a shop or car chargers takes a larger service than a house of the same size on gas.
  • The lighting plan. Recessed lighting throughout, dimming in most rooms and heavy fixtures on high ceilings add far more labor than a standard plan.
  • The distance to power. On a large lot the service may run a long way underground before it reaches the house.

Questions from builders

What size homes does Lollar Electric wire?

Lollar Electric wires new homes of all sizes, from standard single-family houses to custom homes of more than 15,000 square feet. The stages are the same on every house: rough-in before insulation and drywall, then trim once the finishes are in. What changes on a large custom home is the size of the service, the number of panels and the amount of lighting.

When should the electrician be brought into a new build?

The electrician should see the plans for a new house before framing is finished, and earlier if the electrical service will run underground. The panel location, the route of the service and any trenching affect the site work, and they are cheapest to settle on paper. Rough-in itself starts once the house is framed and weathertight, usually alongside the plumbing and mechanical rough-ins.

Where does Lollar Electric wire new homes?

Lollar Electric wires new homes in Prescott, Prescott Valley, Chino Valley and Dewey-Humboldt, and takes work in other parts of Yavapai County and Northern Arizona. We have worked in the region since 1974 and our office is in Prescott. Each of those towns has its own building department, and Yavapai County handles unincorporated areas, so the inspection office depends on where the lot is.

More questions and answers

Where we do new home wiring

We wire new homes across the Quad Cities and Yavapai County.

Building a house?

Call 928-778-2523 with the lot address and the plans. The office is open Monday to Friday, 7:30 am to 4:00 pm.

Page updated

Call nowRequest a quote