Our own equipment
Trenching for underground electrical in Prescott
Lollar Electric digs the trenches for its own underground electrical work on commercial and industrial projects. We own an excavator and a skid steer, so the trench, the conduit and the wire are handled by one company on one schedule.

Two machines for two kinds of trench
Excavator
The excavator digs the larger and deeper trenches: long runs, utility feeds, and work where the depth and the line of the trench have to hold from one end to the other.
Skid steer
The skid steer digs smaller trenches and gets into places where larger equipment is not practical. That includes remodels and sites where other trades are already at work.
We use both on commercial and industrial projects.
Why it matters that we dig our own
Underground conduit is usually the first electrical work on a site, and other work waits on it. When trenching is hired out, the electrician waits for the trenching crew, and then the open trench waits for the electrician. With our own machines, the trench is dug when the conduit is ready to go in.
It also puts one company in charge of the result. How deep the conduit is buried is set by the electrical code and, for a service feed, by the utility. We dig the trench, and we are the ones who have to pass the inspection.
How an underground run goes
Locate what is already there
Before any digging, existing underground lines are located and marked. That starts with a request to 811, the national call-before-you-dig number. Lines that belong to the property owner, such as a private water or septic line, are not covered by 811 and have to be found separately.
Dig to depth
The trench follows the agreed route at the depth the code requires for that kind of conduit in that location. A run under a driveway or a road is treated differently from a run under open ground.
Lay the conduit
The conduit goes in and is inspected, where the building department requires it, before the trench is closed.
Backfill
The trench is filled and compacted. Warning tape is commonly buried above the conduit so the next person to dig there finds the tape first.
Trenching questions
Does Lollar Electric do its own trenching?
Yes. Lollar Electric owns an excavator and a skid steer, and we use them to dig the trenches for our underground electrical work on commercial and industrial projects. The excavator is used for larger, deeper trenches such as long runs and utility feeds. The skid steer is used for smaller trenches and tight spaces. Trenching in-house means the electrical schedule does not wait on an outside crew.
How deep does an electrical trench have to be?
The required depth of an electrical trench depends on what is being buried and where. The National Electrical Code sets minimum burial depths that depend on the wiring and on what is above it. Under open ground that is commonly 18 inches for PVC conduit and 24 inches for cable buried without conduit, with different figures under driveways, roads and concrete. Utilities set their own requirements for service feeds, and these are often deeper. The local building department has the final say.
What makes one trenching job bigger than another?
The size of a trenching job is decided mainly by length, depth and ground conditions. A long run across a site takes more than a short one, and a deep utility feed takes more than a shallow branch circuit. Rock slows digging considerably. Crossing a driveway, a road or existing underground lines adds work, and so does a site too tight for larger equipment.
Related work we do
Where we do trenching
We trench for underground electrical work across the Quad Cities, Yavapai County and other parts of Northern Arizona.
Power has to go underground?
Call 928-778-2523 and tell us where it starts and where it ends. The office is open Monday to Friday, 7:30 am to 4:00 pm.