An owner-builder is a property owner who builds their own house to live in and runs the project as the general contractor. Lollar Electric wires owner-builder houses in Prescott, Prescott Valley, Chino Valley and Dewey-Humboldt, from the layout on your plans to the final inspection, and we plan each stage with you.

What is an owner-builder in Arizona?
In Arizona, an owner-builder is a property owner who builds or improves a house on their own land without a contractor's license. State law allows this when the owner does the work personally, with their own employees or with licensed contractors, and the house is for the owner to live in rather than to sell or rent (A.R.S. § 32-1121(A)(5)).
The same section sets a test for the last point. If the house is sold or rented, or offered for sale or rent, within one year after it is finished or receives its certificate of occupancy, that is taken as evidence that it was built to sell or rent.
Each permit office handles owner-builders in its own way. The Town of Chino Valley, for example, asks for an "Exempt from Licensing" form when an owner-builder is doing the work. Its checklist also lists electrical among the plans required for a new house and requires plans to meet the 2023 National Electrical Code (Chino Valley single-family checklist, January 2026).
This is a summary of the law, not legal advice. Before you start, ask the permit office for your address what it needs from an owner-builder. Our service areas page lists the office for each town and for unincorporated Yavapai County.
What does the electrician need from an owner-builder?
On an owner-builder house you are the general contractor, so the electrical schedule runs through you. We need the plans before framing is finished, a framed and dried-in house before rough-in, and finished walls before trim. The lists below are what lets each stage go ahead when it is booked, without a second trip.
Before rough-in
- The plans, with the panel location and the route the electric service will take from the utility to the house.
- Gas or electric for the heat, the range, the water heater and the dryer. Each electric appliance needs its own circuit, and together they set the size of the service.
- Anything you may add later, such as a car charger, a backup generator or power to a shop. A circuit or an empty conduit costs much less to run while the walls are open than after drywall.
- Where the fixtures and ceiling fans go, so the framing has blocking wherever a fan or a heavy light will hang.
- An early start on the utility. Power to a new house is arranged with the utility. For a lot that APS serves, it starts with a project application on the APS Construction Project Portal, with the plans, deed and permits attached. APS says timelines vary with the job and its current turnaround times.
- A house that is framed and dried in, with the roof on and the windows in.
Before trim
- Drywall hung, finished and painted, with cabinets and countertops in.
- The light fixtures, fans and appliances on site, or a clear list of who supplies what.
Before the power is turned on
- The inspections passed. APS tells customers to schedule an inspection with the local town or county before it connects a new service.
The stages themselves, from layout to final, are described on our new home wiring page.
Why walk through the house at rough-in?
Rough-in is the last time anyone sees the wiring in your walls without cutting drywall. As the owner-builder, walk every room with the plans after the rough-in is done and before the insulation goes in. Check that each outlet, switch, light and fan box is where you want it and at the height you want. Moving a box now is a short job; after drywall it means cutting and patching.
The inspector checks the rough-in against the electrical code. Your walk-through checks it against the house you mean to live in.

Questions from owner-builders
Does Lollar Electric wire houses for owner-builders?
Yes. Lollar Electric wires new houses for owner-builders as well as for licensed builders and general contractors, in Prescott, Prescott Valley, Chino Valley, Dewey-Humboldt and other parts of Yavapai County. The work is the same either way: layout from the plans, rough-in before insulation and drywall, then trim once the finishes are in. The difference is that you are the general contractor, so we settle the schedule with you.
Does an owner-builder have to hire a licensed electrician?
Not under Arizona's owner-builder exemption, which covers work the owner does personally, with their own employees or with licensed contractors (A.R.S. § 32-1121). Anyone you hire to do the electrical is working as a contractor, so check that they hold an Arizona Registrar of Contractors license for electrical work. Whoever does it, the electrical is part of the permit and has to pass the town or county inspections.
Do a generator, solar or a detached garage need their own permit?
Often, yes. On the City of Prescott's "A Home of My Own" standard plans, generator and solar systems and accessory structures such as detached garages and guest houses each need a separate permit. Yavapai County's version of the program says the same for its standard plans. For a custom plan, ask the permit office for your address what the house permit covers.
How do I get a price for wiring the house I am building?
Call Lollar Electric at 928-778-2523, Monday to Friday, 7:30 am to 4:00 pm, with the lot address and the plans, or use the request a quote form. The price of the electrical on a new house depends mostly on its size, the size of the electric service and the lighting plan, so the plans are what we need to see first.
Electrical work on a new house
The parts of an owner-builder house that most often need a decision early. Each page goes into more detail.
Where we work
We wire owner-builder houses across the Quad Cities and Yavapai County. Each town has its own permit office, and the County covers unincorporated land.
Building your own house?
Call 928-778-2523 with the lot address and your plans. The office is open Monday to Friday, 7:30 am to 4:00 pm.